The Project
A two hundred metre main span asymmetric cable stayed bridge, comprising prestressed concrete mainspan linked to approach embankments by multispan continuous viaducts.
The Project attained the IStructE Special Award and BCI Award in 1998.
Our Role in the Project
We undertook the construction sequence and seismic analysis, and the design of the foundations, substructure, tower and prestressed concrete mainspan.
Site supervision of the construction of the bridge including geometric control, construction quality and prestressing works.